Project
Neptunus carried out inspection, troubleshooting, and overhaul of both Port and Starboard MAN AMG 28 EV gearboxes after severe operational issues were reported. The Port gearbox was found seized, and both gearboxes showed heavy contamination due to water and oil mixing.
A detailed inspection confirmed internal damage including corrosion, rusting, and deterioration of critical components due to water ingress. Based on findings, a complete overhaul along with seal replacement and consumable renewal was executed.
Post overhaul, the gearbox was reassembled, tested, and restored to smooth operational condition. System flushing and oil analysis confirmed negligible water content, ensuring reliability and readiness for vessel operations.Leave a Reply
Latest Projects
