Project
Neptunus carried out the major overhaul of two bow thrusters and one stern thruster equipped with Kawasaki KT-55 B3 Thruster units on an AHTS vessel in Nigeria. The work included dismantling and workshop shifting of the thruster assemblies, gear case inspection, input shaft and propeller shaft assembly overhaul, component measurements, Dye Penetrant testing and replacement of required OEM spare parts.
New bearings, seals, liners, O-rings, gaskets, shims, locking components and other related spares were installed as required. Axial displacement, gear backlash, pitch movement and other operational checks were carried out. Stern tube seals were inspected and renewed, while the stern thruster seal housing top plate was machined by a third party after damage during dismantling.
The thruster assemblies were reassembled and fitted back in position. Pitch zero and operational checks were carried out satisfactorily. A sea trial could not be conducted due to the unavailability of propeller shafting.Leave a Reply


We use cookies to enhance your browsing experience, analyze website traffic, and improve our services. By clicking "Accept", you consent to the use of cookies. You can manage your preferences at any time. For more information, please review our Privacy Policy.