Project
Neptunus successfully carried out a 60K overhaul of an EMD 16-645-E8 main engine installed on a drilling rig in India. The engine had accumulated approximately 59,370 running hours at the start of the overhaul. The previous 30K overhaul was carried out by Neptunus in 2016 at approximately 30,828 running hours.
Prior to dismantling, the engine operating parameters were recorded. The customer reported recurring failures of the left- and right-bank water pumps due to seal and shaft issues. Minor leakage was also observed at the accessory-end oil line, along with leakage from both water pump seals.
The overhaul included comprehensive inspection, cleaning, calibration, component renewal, reassembly, pre-commissioning, safety testing, and load trials. Major activities included renewal of power pack assemblies, cylinder test valves, injectors, rocker arms, camshaft bearings, main and connecting rod bearings, camshaft and gear train components, blowers, water pumps, lube oil and piston cooling pumps, governor drive components, and associated seals and gaskets.Neptunus successfully completed the 60K overhaul of the EMD 16-645-E8 main engine installed on a drilling rig in India. The overhaul involved systematic dismantling, inspection, cleaning, calibration, component renewal, reassembly, pre-commissioning, safety testing, and load trials.
The successful completion of the overhaul, safety checks, and load trials confirmed satisfactory engine performance and demonstrated Neptunus’ capability in delivering comprehensive EMD engine overhaul services for offshore drilling applications in India.Leave a Reply
We use cookies to enhance your browsing experience, analyze website traffic, and improve our services. By clicking "Accept", you consent to the use of cookies. You can manage your preferences at any time. For more information, please review our Privacy Policy.