Project
Neptunus carried out a 30K major overhaul of the EMD 12-645 E8 engine onboard a jack-up drilling rig operating in DR Congo after 35512 running hours. The objective was to restore engine performance, eliminate wear-related risks, and ensure reliable offshore operation.
The scope included complete power pack replacement, crankshaft and bearing inspection, fuel system overhaul, cooling system servicing, and full recalibration as per OEM standards. Critical components such as camshaft bearings, injectors, pumps, gears, and seals were renewed or serviced.
Post overhaul, the engine was successfully tested under no-load and full-load conditions. All operating parameters including pressure, temperature, and load response were stable and within acceptable limits, confirming successful restoration.Neptunus successfully completed the 30K major overhaul of EMD 12-645 E8 engine onboard a jack-up drilling rig operating in DR Congo. Through systematic execution, full power pack renewal, and precise calibration, the engine was restored to stable and reliable operational condition.
The successful load trial and safety verification confirmed full readiness for continued offshore drilling operations.Leave a Reply
Latest Projects

