Skip to content
Our Solutions
Condition Monitoring System (CMS)
Vibration Condition Monitoring System
Engine Condition Monitoring System
Oil Condition Monitoring Solution
IIOT Enabled End-to-End Solution
Oil Quality Management Solution (OQMS)
Oil Condition Monitoring Solution
Oil Filtration Systems
TorqueSense – Torque and Power Measurement
Maintenance (Service + Spare)
EMD & NIIGATA
EMD
NIIGATA
CAT
Industries
Defence
Knowledge Center
Blog
Case Studies
Web Stories
News
Events
INMARCO 2022
DefExpo 2022
Downloads
Career
About Us
Contact Us
Close menu
Our Solutions
Condition Monitoring System (CMS)
Vibration Condition Monitoring System
Engine Condition Monitoring System
Oil Condition Monitoring Solution
IIOT Enabled End-to-End Solution
Oil Quality Management Solution (OQMS)
Oil Condition Monitoring Solution
Oil Filtration Systems
TorqueSense – Torque and Power Measurement
Maintenance (Service + Spare)
EMD & NIIGATA
EMD
NIIGATA
CAT
Industries
Defence
Knowledge Center
Blog
Case Studies
Web Stories
News
Events
INMARCO 2022
DefExpo 2022
Downloads
Career
About Us
Contact Us
Toggle menu
MARINE CASE STUDIES
Home
»
Case Studies
»
Marine Case Studies – Industry Specific Case Study
Early Fault Detection and Fuel Loss Management Enabled for 12 Cyllinder - 2 Stroke Doosan Sulzer Cargo Engines with Engine Condition Monitoring System by Neptunus
Read Now
ECMS Helped Eliminate 1 Complete TOH And Savings of 73% on MOH Spares with Real-Time Monitoring
Read Now
ECMS Assisted in Fault Finding to Extend MOH Which Otherwise Costs ~$2,50,000 for 7 Vessels
Read Now
Quick Job Completion Lead to Savings of Potential LD Charges of ~$50,000 for a Supply Vessel
Read Now
ECMS Enables ~USD 14,000 Direct Savings And Avoids The Consequential Expenses to the Tune of ~USD 30,000
Read Now
Early Detection of Fault & Precision in Diagnosis Saves 70% of the Overhaul Cost and Avoids Revenue Loss of ~USD 14,000
Read Now
ECMS Helped Customer to Extend Major Overhaul And Saved $100,000 Without any Risk with Real-Time Monitoring
Read Now
Remote Support During Lockdown Saved ~$37,000 for a Supply Vessel
Read Now
Timely Job Completion Saved a Potential Loss ~$40,831 in Revenue
Read Now
Quick Job Completion Lead to Savings of Potential LD Charges of ~$50,000 for a Supply Vessel
Read Now
Careers
Contact Us
×
Email
×
Email